Installation_manual_A_Series_Chiller

Bu sayfa, kılavuzun PDF dosyasındaki metnin tamamıdır (sayfa sayfa). Görseller ve çizimler için PDF'i açın. — sibastore.com

Sayfa 1

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

LSQWRF35VM/NaA-M、LSQWRF60VM/NaA-M
LSQWRF65VM/NaA-M、LSQWRF70VM/NaA-M

Sayfa 2

Thank you for selecting Gree’s product. Please read this instruction manual carefully before
installing and using the product, so as to master and correctly use the product. In order to

guide you to correctly install and use our product and achieve expected operating effect, we
hereby instruct as below:

(1)This equipment should be installed, operated or maintained by the qualified

servicemen who have had specific training. During operation, all safety issues

covered in the labels, User’s Manual and other literature should be followed strictly.

This equipment is not intended for use by persons (including children) with reduced
physical, sensory or mental capabilities, or lack of experience and knowledge, unless

they have been given supervision or instruction concerning use of the appliance by a
person responsibility for their safety. Children should be supervised to ensure that

they do not play with the appliance.

(2)This product has gone through strict inspection and operational test before leaving the

factory. In order to avoid damage due to improper disassembly and inspection, which
may impact the normal operation of unit, please do not disassemble the unit by

yourself. You can contact with the special maintenance center of our company if

necessary.

(3)For personal injury or property loss and damage caused by improper operation such as

improper installation and debugging, unnecessary maintenance, violation of related
national laws and rules and industrial standard, and violation of this instruction

manual, etc., we will bear no liability.

(4)When the product is faulted and cannot be operated, please contact with our

maintenance center as soon as possible by providing the following information.

1) Contents of nameplate of product (model, cooling/heating capacity, product No.,

ex-factory date).

2) Malfunction status (specify the situations before and after the error occurs).

(5)All the illustrations and information in the instruction manual are only for reference. In

order to make the product better, we will continuously conduct improvement and

innovation. We have the right to make necessary revision to the product from time to
time due to the reason of sales or production, and reserve the right to revise the

contents without further notice.

(6)The final right to interpret for this instruction manual belongs to Gree Electric

Appliances Inc. of Zhuhai.

To Users

Sayfa 3

1 Safety Notices............................................................................................................ 1

2 General Introduction.................................................................................................. 6

2.1 Product Features ................................................................................................. 7

2.2 Principle Diagrams .............................................................................................. 8

3 Operation Range ....................................................................................................... 8

4 Outline Dimensions ................................................................................................... 9

5 Installation Instructions............................................................................................ 10

5.1 Pre-check........................................................................................................... 10

5.2 Acceptance Check............................................................................................. 10

5.3 Handling and Lifting............................................................................................11

5.4 Installation Foundation and Service Space....................................................... 12

5.5 Vibration Reduction ........................................................................................... 13

5.6 Installation of the Water System........................................................................ 14

6 Introduction to the Display Panel............................................................................. 16

7 Electric Wiring.......................................................................................................... 16

7.1 External Wiring of the Electric Control Cabinet ................................................. 16

7.2 Specification of Power Cord and Air Switch ...................................................... 17

7.3 Wiring of the Electric Control Cabinet................................................................ 18

7.4 Filed Wiring........................................................................................................ 18

7.5 Networking and Wiring between Units .............................................................. 20

7.6 Setup of Toggle Switches on the Motherboard.................................................. 21

7.7 Jumpers ............................................................................................................. 22

8 Commissioning and Maintenance........................................................................... 23

8.1 Check before Startup......................................................................................... 23

8.2 Requirements on Water Quality and Cleaning.................................................. 23

8.3 Trial Run ............................................................................................................ 25

8.4 Routine Startup/Shutdown ................................................................................ 25

8.5 Maintenance to the Main Parts.......................................................................... 26

8.6 Maintenance during Long-term Downtime ........................................................ 26

8.7 Startup after Long-term Shutdown .................................................................... 26

8.8 Parts Replacement ............................................................................................ 26

8.9 Refrigerant Charging ......................................................................................... 27

8.10 Removal of the Compressor............................................................................ 27

8.11 Freeze Protection............................................................................................. 28

Contents

Sayfa 4

8.12 Rountine Maintenance..................................................................................... 28

8.13 Precautions...................................................................................................... 29

9 Troubleshooting and After-sales Service ................................................................ 30

9.1 Troubleshooting Measures................................................................................ 30

9.2 After-sales Service ............................................................................................ 32

Sayfa 5

1 Safety Notices

Warning:If not abide strictly, it may cause severe damage to the unit or the people.

Note:If not abide strictly, it may cause slight or medium damage to the unit or the people.

This sign indicates that the operation must be prohibited. Improper operation may cause

severe damage or death to people.

This sign indicates that the items must be observed. Improper operation may cause
damage to people or property.

◆Safety Notices for On-site Installation

(1)Installation should be performed by qualified servicemen who have taken

specialized training and acquired corresponding certificates in accordance with

relative laws, regulations and this manual, otherwise it would lead to damage to the
unit, water leakage, electrocution, or fire hazards etc.

(2)The unit should be installed on the smooth foundation capable of supporting the unit

and fixed with screw bolts. The foundation with inadequate strength would lead to

leakage, turn-over or personal injury or death.

(3)Special lines should be used for electric installation by qualified electricians. Lines

with inadequate capacity would lead to electrocution or fire hazards.

(4)Make sure each connector is properly tightened; otherwise it would lead to

overtemperature or fire hazards etc.

(5)When installation is finished, please check for the drainage lines, pipelines, and

electric lines to prevent water leakage, electrocution or fire hazards.

(6)This equipment should be installed where the drainage system can work well. Never

block the drain hole. Improper drainage system would lead to drainage difficulty and
make the unit suffer from malfunctions.

(7)When there is something unusual (like stinky smell) during installation or

commissioning, please cut off the main power at once and then contact the

aftersales service center. This ongoing unusual condition will damage the air
conditioning unit and lead to electrocution or fire hazards

(8)When refrigerant leaks, take corrective measures as soon as possible to prevent

oxygen depletion by increased refrigerant concentration.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

WARNING

1

Sayfa 6

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

(1)Do not install the unit where there is high-intensity magnetic field or it is highly basic

or acid or the voltage is quietly unstable.

(2)Do not install the unit where there would be leaked inflammable gas, as it would lead

to fire hazards.

(3)The outer casing of the unit should be grounded. Do not connect the grounding line

to the gas line, water line, lightning rod or communication line, otherwise it would

lead to electric shocks.

(4)Do not stand on the unit or place other object on it.

(5)Do not insert fingers or other objects into the outlet grill to prevent damage to the unit

or personal injury or death.

(6)Do not start or stop the unit by inserting or drawing out the power plug.

(7)Do not let children play with this unit.

(8)The unit should be equipped with the leakage protector which should be installed in

accordance with electric technical standards. Uninstallation or incorrect installation
would lead to electrocution. Do electric leakage detection after electric installation is

finished.

(9)Volatile liquid like thinner or gasoline would damage appearance of the unit. (Only

clean the outer casing with of the unit with soft dry cloth or wet cloth with neutral
detergent.

(1)Do not install the unit where conditions are severe, where it is close to the hot spring,

coast or oil field, as it would lead to corrosion, electrocution or fire hazards.

Besides, do not install the unit where there are corrosive, inflammable substances
or smog, otherwise it would lead to normal operation failure, shortened service life,

fire hazard, or severe injury.

(2)Do not start the compressor by manually closing the AC contactor, otherwise it would

lead to electrocution or fire hazard.

(3)Do not misuse refrigerant, as it would lead to normal operation failure, unsatisfactory

performance, fire hazards or even explosion etc.

NOTE

DANGER

2

Sayfa 7

(1)Installation should be done in accordance with this manual. Please read it manually

prior to startup or troubleshooting.

(2)Installation should be done by qualified servicemen, as incorrect installation would

lead to water leakage, electrocution or fire hazards etc.

(3)Before installation, check for all power supplies with the nameplate and check for its

safety.

(4)The unit should be grounded and there should be specialized grounding line for the

power socket to avoid of electrocution. Do not connect the groundling line to the gas

tank, water line, lightning rod, or telephone line.

(5)Only specialized accessories and parts are allowed for installation, otherwise it

would lead to water leakage, electrocution or fire hazards etc.

(6)Size of the power lines should be large enough. Only specialized power lines are

allowed for replacing the damaged ones.

(7)When power lines have been connected, install the electric box as well to avoid of

any safety problems.

(8)After all installation has been finished, take an overall check to the unit before

powering it on.

◆Safety Precautions for Usage and Maintenance

(1)When there is something unusual (like burnt smell), cut off the power supply at once

and contact the sales agent. The ongoing unusual condition would lead to

malfunctions, electrocution or fire hazards.

(2)When refrigerant leaks, take corrective measures to prevent oxygen depletion by

increasing refrigerant concentration.

(3)Do not use or place inflammable or explosive substances near the unit.

(4)Do not do troubleshooting personally, as incorrect troubleshooting would lead to

electrocution or fire hazards. Instead, please contact GREE after-sales service

center.

(5)When the unit is charged with refrigerant, do not solder or cut any pipeline, fined

heat exchanger, shell-and-tube heat exchanger or other containers.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

CAUTION

WARNING

3

Sayfa 8

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

(1)Do not let the unit out of the designed application range; otherwise it would cause

the heat exchanging tube cracking, refrigerant leakage or even explosion.

(2)Do not let the cold/heat source directly act on the stored foods, plants, animals,

precision instruments, and curiosities, otherwise their quality would be degraded.

(3)Only circulating water with satisfactory water qualify are allowed for the unit, as

unsatisfactory water quality would shorten the service life of the unit or even

malfunctions.

(4)When the unit has been put into use for some time, check for security of the

installation foundation. Unstable foundation would lead to deformation or even
safety accident.

(5)Once the unit is started up, stop it at least 6 minutes later, otherwise it would shorten

the service life of the unit. Never deliberately start or stop the unit frequently.

(6)Under subzero climatic conditions, pay attention to freeze protection. When the unit

is out of use in short time, do not cut off the power supply, as freeze protection will

not act normally. When the unit is out of used in quite long time, add anti-freezing
agent to water or drain the water system, otherwise it would make the shell and

tube crack and then leak.

(1)Do not use the fuse out of the normal range or replace it with the electric wire,

otherwise it would damage the unit or lead to fire hazards.

(2)Do not start or stop the unit directly by the power switch, as it would be likely to

cause electrocution or fire hazards.

(3)Do not change settings of safety devices; otherwise it would lead to fire hazards and

explosion.

(4)Do not operate the unit with wet hands.

(5)Do not clean the unit without cutting off the power supply, as it would lead to

electrocution or personal injury.

(6)Do not let children pull power lines or climb the unit to prevent of electrocution or

other dangers.

(7)Do not touch high-temperature parts of the compressor and refrigerant lines, as it

would lead to burns.

(8)Do not touch sharp edges and fins of the heat exchanger; otherwise it would lead to

personal injury.。

(9)Do not touch any moving part; otherwise it would lead to accidental injury.

(10)Do not stand on the unit or replace objects on it.

(11)Do not bend pipeline and retrofit the unit, otherwise it would lead to refrigerant

leakage, explosion, fire hazards or personal injury.

NOTE

DANGER

4

Sayfa 9

(1)Do operate the unit in accordance with this manual and read it carefully before

startup or troubleshooting.

(2)Do turn on or off the unit with the controller.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

CAUTION

5

Sayfa 10

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

◆Safety Precaution for Handling of the Unit

Safety Precaution for Handling of the Unit

(1)Please contact the contractor for handling and installation. Improper installation

would lead to electrocution or fire hazard.

(2)During installation or handling, do not let foreign matters mixed with refrigerant and

do not air trapped inside the pipe, as it would lead to increased system pressure or

explosion of the compressor.

(3)Only specialized power lines are allowed. Wiring terminals should suffer no any

external force and are fixed properly; otherwise it would lead to fire hazards.

Besides, make sure insulation of power lines always in good condition.

(4)Connection between two ends of the power lines is not allowed. When its length is

not enough, please contact the after-sales service center for customizing another
one long enough.

(1)Treatment of water, cleaning solution, refrigerant or other waste liquid or gas should

comply with local laws and regulations; otherwise it would lead to adverse effect to
health and environment.

(2)Do not misuse refrigerant, as it is one of the causes of fire hazard and explosion.

Precautions for Refrigerant Charging

When charging is interrupted or finished, reinspect the unit but do not let the compressor

run into operation.

Do not use mixture of refrigerant vapor and air or oxygen for pressurizing for fear of
explosion.

2 General Introduction

See the nameplate for the main technical data.

The all-inverter modular air-cooled chillers are capable of performing cooling all year around
with high energy efficient. It requires no cooling towers and is quite applicable to water-

deficient areas, and can be widely used at newly built or retrofitted industrial and civil buildings
in various sizes, such as, hotels, apartments, restaurants, office buildings, shopping malls,

theaters, gyms, workshops, hospitals, places where there is requirement on cooling under

ultra-low temperature, like cold storages, places where require cooling for dairy products,
foods and industrial products, and especially places where there are high requirements on

WARNING

CAUTION

NOTE

WARNING

6

Sayfa 11

noise level and surrounding environment and boils and cooling towers are not allowed or hard
to be installed.
2.1 Product Features

The all-inverter modular air-cooled chillers work outstandingly by virtue of their major

features stated below..

■
Excellent compatibility:

The all-inverter modular air-cooled chillers can be constructed of multiple single units with

the same or different structure or capability (30kW, 60kW, 65kW and 70kW). For the 35kW

unit, it has only one cooling system; for the 60kW, 65kW and 70kW units, they are of two
independent systems. Up to 16 single units can be modularized, with cooling capacity ranging

from 35kW to 1104kW.

■
Comfort and energy saving:

The variable-frequency technology can quickly respond to load change and lead to
decreased water temperature fluctuation and better comfort.

■
Ultra-quiet:

The high-efficiency and low-noise fan blades and motor as well as the optimized air passage

can greatly lower operation noise of the unit. Besides, the quite mode can provide the user a
ultra-quite environment.

■
Powerful self-protection:

It is equipped with the top-end microcomputer control system which is capable of providing
well-rounded protection and self-diagnosis.

■
High reliability:

It is constructed of well-designed refrigeration parts and well-designed system, structure

and electric control, adequately guaranteeing reliable operation

■
Remote ON/OFF:

The unit can be started or stopped by the ON/OFF key operation.

■
Equilibrium running:

It indicates each compressor will run alternately so as to extend their service life.

■
Shiftwork of water pumps:

Two water pumps can work alternately with equilibrium runtime so as to extend their service

life and lower the maintenance difficulty.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

7

Sayfa 12

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

2.2 Principle Diagrams

3 Operation Range

Please run the unit under the specified operation range as shown in the table below:

■
R410A Series

Water Side
Air Side

Item

Leaving Water

Water Temperature

Temperature(℃)

Difference(℃)

Cooling
5~20
2.5~6
–15~52

Heating
35~50
2.5~6
-20~40

8

Ambient DB

Temperature(℃)

Sayfa 13

4 Outline Dimensions

(1)LSQWRF35VM/NaA-M(unit:mm)

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

9

Sayfa 14

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

(2)LSQWRF60VM/NaA-M, LSQWRF65VM/NaA-M,LSQWRF70VM/NaA-M (unit:mm)

5 Installation Instructions
5.1 Pre-check

Installation should be performed by the skilled technician to guarantee the normal operation

and prevent malfunctions and please read this manual carefully prior to installation.

The chiller is manufactured, inspected and tested strictly in accordance with the quality
control program and it will work properly within the expected service life as long as its

installation, operation and service.
5.2 Acceptance Check

The user is responsible for organizing personnel to perform the acceptance check at the
regulated plate of delivery. Checks listed below should be taken as a minimum.

(1)If all required documents and accessories are provided as per the packing list.

(2)Check the equipment model.

(3)If the equipment is damaged and all parts are provided.

(4)If refrigerant leaks.

(5)Do not remove the protective cover on the flagon of the shell-and-tube heat exchanger

before connecting the water tube and check if the water pipe is clean.

(6)Check if the installation and operation are within the allowable conditions.

10

Sayfa 15

When there is damager or any other question, contact the local sales representative for
applicable solutions.

NOTE
After the acceptance check, take necessary protection to the unpacked equipment. Note

that it is not recommended to unpack the equipment too early to avoid any unexpected

damage.

5.3 Handling and Lifting

Each unit will undergo a series of strict factory inspections and tests to guarantee the

expected performance and quality. However, special attention should be paid during handling
and shipping to prevent the control system and the piping system from being damaged.

The unit should be moved by the forklift or hoisting machine. During lifting, the canvas lifting
or steel ropes in use should be of enough strength and go through the based and then bundled

tightly. The unit should be lifted stably from four corners. Meanwhile, be sure there should be
protective pads to prevent lifting ropes contacting with the unit. The inclination angle during

lifting should be less than 15 degree. The unit should be moved softly and severe collision and
forced drag are not allowed. Please do lifting as shown in the figure below for units with similar

structure.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

11

Sayfa 16

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

5.4 Installation Foundation and Service Space

(1)Installation foundation shall be designed by the qualified designer in accordance with

the actual condition.

(2)A rubber pad shall be placed under the base of each single unit and then secured on

the ground or the roof. Alternatively, each single unit can be placed side by side on the
parallel channel steel with enough strength which then shall be secured with anchor

bolts. Distance between each single unit shall be keep 0.5m as a minimal.

(3)Enough space shall be left for service and ventilation. Be sure there is at least 2m

between the equipment and any barrier and it is better to set up a sun cover 3m ahead

of the equipment.

(4)The unit shall be installed where it will not be affected by fire, corrosive, inflammable or

waste gas, and proper measures shall be taken to minimize the vibration and noise.

(5)The unit shall be installed where the defrosting water can be drained out favorably

(6)Do not install the unit where there is heavy snow. If inevitable, build a foundation at

least 300mm higher than the ground.

■
Installation Space for the Single Unit

■
Installation Space for Modularized Units

(Unit:mm)

(Unit:mm)

12

Sayfa 17

Note: diagrams above are just for reference and not in real proportion.
5.5 Vibration Reduction

The unit shall be securely attached to the foundation through the mounting hole by following

the steps below.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

13

Sayfa 18

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

(1)Be sure the planeness of the concrete foundation is within ±3mm and the foundation

shall be covered by a rubber pad.

(2)Lift the unit until to the height where it is available to install the spring shock absorber.

(3)Remove screws fixing the spring shock absorber.

(4)Place the unit on the spring shock absorber and align the bolt holes of the spring shock

absorber with the mounting holes on the base of the unit.

(5)Tighten screws removed in step 2.

(6)Adjust the height of the spring shock absorber and make sure the deflection is equal all

round the spring shock absorber.

(7)Tighten the locking screws.
5.6 Installation of the Water System

■
Considerations stated below shall be taken carfelly for the water system.

(1)Each water inlet and outlet should be labeled properly to avoid misconnection.

(2)A flexible connector should be used at the chilled water outlet to reduce vibration

transmission.

(3)A manometer, a thermometer and a gate valve shall be installed at the chilled water

inlet /outlet. Moreover, a drain valve shall be installed at the outlet and an air release

valve shall be installed at the inlet. At the highest point of the water system, another

release valve shall be installed, while at the lowest point of the water system, another
drain valve shall be installed to facilitate drainage.

(4)The water inlet/outlet pipe should be tightly insulated to reduce heat loss and dewing.

When pipes are exposed under 0℃, a electric heater shall be installed.

(5)There surely be some foreign matters in the water system which would generate scale

on the surface of the heat exchanger, so a filter shall be installed upstream of the

water pump.

(6)The unit shall be bypassed during flushing to prevent drain out from entering the

system.

(7)Under ultra-low temperature in winter, showdown at night will cause the evaporator

and pipeline frozen up, so it is highly recommended to add alcohol and propanol
mixture in chilled water. Do not cut off the power supply when the unit is turned off,

otherwise the freeze protection does not work. Alternatively, cut off the power supply
and drain the water system thoroughly.

(8)When the unit runs under the low load requirement, in order to avoid low load

protection which would affect the service life of the unit, make sure the water capacity

is more than 1/6 of total rated flow rate per hour of each module (for instance, for

some project with four modularized LSQWRF60VM/Na-M units, if the rated water flow
of each unit is 10.3m3/h, then the required capacity of the whole project should be

larger than 10.3*4*1/6=6.87m3/h). When the water course is quite short, a water tank
is required; otherwise the service life of the unit would be affected.

14

Sayfa 19

Never use salt mixture to prevent the unit from being corroded.

■
How to install the water system

■
How to drain the water system:

(1)Loosen screws around the panel and then take down it.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

NOTE

15

Sayfa 20

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

(2)Remove anticlockwise the blind plug located at the bottom of the heat exchanger to let

the chilled water flow out, after that, tighten the blind plug and reinstall the panel. (-

Note: place the drainage equipment beneath the drain pipe to prevent pollution

caused by the drain water.

Keep the purge valve of the water system open in order to drain the evaporator and
condenser completely.

6 Introduction to the Display Panel

See the Operation Instructions for the Display Panel of the inverter modular type chillers for
more details.
7 Electric Wiring
7.1 External Wiring of the Electric Control Cabinet

■
LSQWRF35VM/NaA-M,LSQWRF60VM/NaA-M,LSQWRF65VM/NaA-M and
LSQWRF70VM/NaA-M

Note: the output control lines of the AC contactors for the running indicator, water pump 1,
water pump 2, auxiliary electric heater 1, auxiliary electric heater 2 can be wired to the

NOTE

16

Sayfa 21

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

corresponding wiring board of any one unit, while those for the error indicator and extemal
passive contact switch should be wired to the corresponding wiring board of all units as shown

in the figure below.

7.2 Specification of Power Cord and Air Switch

See the table below for selectin of the power lines and the air switches.

Min. sectional area of the

power cable(mm2)
Capability of the

Model
Power Supply

Air Switch Live

(A)
Live
Line

Neutral

Earth

Line

Line

LSQWRF35VM/

380V~415VAC 3Ph
50Hz
6
6
6
32

NaA-M

LSQWRF60VM/

380V~415VAC 3Ph

50Hz
16
16
16
63

NaA-M

17

Sayfa 22

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

LSQWRF65VM/

380V~415VAC 3Ph
50Hz
16
16
16
63

NaA-M

LSQWRF70VM/

380V~415VAC 3Ph
50Hz
16
16
16
63

NaA-M

Notes:

(1)The specifications of the breaker and power cable listed in the table above are

determined based on the maximum power (maximum amps) of the unit.

(2)The specifications of the power cable listed in the table above are applied to the

conduit-guarded multi-wire copper cable (like, JYV copper cable, consisting of PV
insulated wires and a PVC cable jacket) used at 45℃and resistible to 90℃(GB/T

16895.15-2002). If the working condition changes, they should be modified according
to the related national standard.

(3)The specifications of the breaker listed in the table above are applied to the breaker

with the working temperature at 40℃. If the working condition changes, they should

be modified according to the related national standard.
7.3 Wiring of the Electric Control Cabinet

■
LSQWRF35VM/NaA-M,LSQWRF60VM/NaA-M, LSQWRF65VM/NaA-M,
LSQWRF70VM/NaA-M

7.4 Filed Wiring

■
Safety Codes

(1)All wiring shall comply with applicable codes and engineering requirements.

(2)All field wiring shall be performed by the qualified electrician.

(3)Never perform wiring before the power supply is cut off.

18

Sayfa 23

(4)Any damage caused by the improper external wiring shall be at the installer’s expense.

Only copper conductor is allowed.

■
How to wire the power lines to the electric box

(1)The power cord must be routed inside the conduit.

(2)The power cord must enter the electric box through a rubber or plastic ring to avoid any

damaged caused by the sharp edge of the metal sheet.

(3)The power cord close to the electric box must be attached securely to prevent the

terminal block of the electric box affected by the outside force. The Power cord shall
be installed with a suitable cord anchorage against cord loosing.

(4)The unit shall be grounded reliably and never connect the ground wire with the gas fuel

pipe, water pipe, lightening rod or telephone line.

(5)After wiring, O-rings should be tightened to prevent coming of insects.

■
Control Line

(1)The field supplied control line shall be at a minimum 1mm2.

(2)The electric box will send the control signal (220 AC, 5A) to control the chilled water

pump and auxiliary electric heater, however, never do not drive them directly through

the control signal but through their AC contactors.

(3)Switching signals (220VAC, 2A) for the running and error indicators are available for

the electric box.

(4)The remote switch control signal is available for the electric box and please pay

attention to the input passive dry contact.

(5)A reasonable length of the control line should be left outside the unit and the rest

should be bundled and fed into the electric box.

(6)The connection line of the display panel and main board is reliably grounded through

the main board. Beside, communication lines between units also should be grounded.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

WARNING

19

Sayfa 24

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

7.5 Networking and Wiring between Units

Notes

(1)CN25 and C47 of each unit should be connected through the three-core grounded

communication line with the shielding layer. The ground wire of the communication
lien should be grounded reliably as shown in the figure above.

20

Sayfa 25

(2)The CN4 of the display panel should be connected to the unused CN47 at the main

board of the unit though the four-core grounded communication with the shielding

layer. Pay attention that the grounding wire of the communication line is close to the

main board and should be connected to it.

(3)The power lines should be connected to L1, L2, L3, and N at XT1 through a piece of

four-core rubber sleeve cable as shown in the figure above.

(4)There are two solutions for remote monitoring.

1) Install the remote monitoring software at the PC.

2) Based on GREE provided Modbus protocol, the user can do second development
to this protocol.

Note: those enclosed by the dotted lines indicate the remote monitoring equipment.
When the quantity of the display panel exceeds 30 or length of the communication line

exceeds 800m, extra photoelectric relay is required. The photoelectric relays,
communication lines (class 5 twist pairs), converters are optional. PC should be

prepared by the user themselves.

(5)“35” indicates the unit LSQWRF35VM/NaA-M. Each unit is taken as a module.

“60” indicates the unit LSQWRF60VM/NaA-M. Each unit is taken as a module.

“65” indicates the unit LSQWRF65VM/NaA-M. Each unit is taken as a module.

“70” indicates the unit LSQWRF70VM/NaA-M. Each unit is taken as a module.
7.6 Setup of Toggle Switches on the Motherboard

Five-bit toggle switches are used for indicating hardware address (1~16) of modules, with

module No. displayed in turn on the panel as Module 1, Module 2, ……, Module 16. Toggle
switches 1,2,3,4 and 5 are binary codes, with 1 for the lowest bit and 5 for the highest bit.

Comparison drawings are as follows (Caution: only in the condition of power supply shutoff

can toggle switches be set):

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

21

Sayfa 26

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

Note: the black block represents where the projecting lever of the toggle switch is.
7.7 Jumpers

When it is required to replace the main board, be sure the main board can match with the
applicable jumpers.

Table 7.7.1 Jumpers List

Model
Code
Jumper No
Matched

LSQWRF35VM/NaA-M
4202021905
QXAS-

LSQWRF60VM/NaA-M
4202021907
QXAS-
H80zN345H

LSQWRF65VM/NaA-M
4202021906
QXAS-
H80zN345H

LSQWRF70VM/NaA-M
4202021908
QXAS-

22

Compressor

H80zN345H

H80zN345H

Sayfa 27

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

8 Commissioning and Maintenance

The unit shall be maintained periodically by the skilled servicemen from Gree or a designed
person under our professional guide to guarantee the unit operates reliably in a long term.
8.1 Check before Startup

Please finish the following steps before staring the system.

(1)Before energization, be sure the insulation resistance between the wiring terminal and

ground complies with the local codes and regulations and check if the motor meets

the insulation requirement with a resistance meter.

(2)Check if all connenctions are in good condition and clean.

(3)Close the main power switch.

(4)Check if the voltage between terminals keeps balance within deviation of 2%.

(5)Be sure the power cord is capable of carrying the rated current on the nameplate.

(6)Be sure all valves of water and refrigerant pipeline are placed properly.

(7)Reset all hand reset control elements.

Be sure all sensor are placed installed properly.
8.2 Requirements on Water Quality and Cleaning

Be sure to open the water pump after the water system has been flushed times and the

water quality has met the requirements and meanwhile be sure the water flow rate and
pressure are within the allowable range.

The industrial water generates little scale when used as the refrigeration medium while the

well or river water will generate much more scale and sands which would reduce the flow rate

of the evaporate and cause freezing. Therefore, the well or river water must be firstly treated
with the water softening equipment and analyze the PH, heat conductivity, Cl ion, and S ion

before use.

Table 8.2.1 Water Quality

Water Quality Requirement

Cold/hot water
Trend

Items

Makeu-

Circulating

Corro-

Sc-

p water

water

sion

ale

PH(25℃)
6.8-8.0
6.8-8.0
6.8-8.0
0

Electrical conductivity

(25℃)
μs/cm
<400
<300
0
0

Cl-
mg(Cl-)/L
<50
<50
0
 

Basic
items

SO42-
mg(SO42-)/L
<50
<50
0
 

Acid consumption

(PH4.8)
mg(CaCO3)/L
<50
<50
 
0

Total hardness
mg(CaCO3)/L
<70
<70
 
0

23

Sayfa 28

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

Fe
mg(Fe)/L
<1.0
<0.3
0
0

Total
hardn-

S2-
mg(S2-)/L

ess

NH4+
mg(NH4+)/L
<1.0
<0.3
0
 

SiO2
mg(SiO2)/L
<30
<30
 
0

NOTE:“○”indicates possible corrosion or scaling.

Even if the water qualify is under the strict control, calcium dioxide or other minerals will still
form on the surface of the heat exchanger which will affect the heat exchange efficiency and

be eliminated by formic acid, lemon acid, acetic acid or other organic acid.

Therefore, the pipe system should be cleaned periodically. Oxalic acid, acetic acid and

formic acid can be used as the organic cleaning agent, but the strong chloracid is not allowed
as it will corrode the copper tube of the heat exchanger and then lead to water and refrigerant

leakage.

■
Preparation of Materials and Tools

Several bags of environmental friendly scale remover, or similar cleaning liquid.

■
Cleaning Instructions

Step 1: estimate the required amount of scale remover in accordance with the system water
volume and severity of scaling.

Step 2: add the scale remover to the water tank and the scale remover.

Step 3: start through the contactor the water pump every 10 minutes and spread the scale

remover in water more quickly and widely.

Step 4: after that, follow the steps below:

(1)let the water pump run for another 1-2 hours.

(2)1-2 hours later, change the cleaning solution to anti-rusting agent. Then, drain the

water system and check the water quality. If water is cloudy, then it indicates the
cleaning effect is satisfactory.

(3)open the water inlet to see if scale on the shell and tube has been removed. If not,

clean the shell and tube separately again by the skilled serviceman and then rinse

them. If there is still sand, scale and other foreign matters at the bottom of the shell
and tube, let cleaning solution in from the inlet pipe and then let the foul water out

through the drain outlet.

(4)fully charge the water system and let it run for another 1-2 hours.

(5)stop the unit to drain up waste solution. If impossible, drain it with making up water at

the same time until all waster solution has been drained out completely (at this time

water is transparent and PH is 7).

(6)repeat 4 and 5.

(7)clean or change the filters in the water system.

(8)see if the difference between the entering and leaving water temperature is improved.

Undetecta-

Undet-

ble

ectable
0
 

24

Sayfa 29

■
Precautions

(1)Although the cleaning agent is innocuous,care also should be taken not to let it spill

into eyes.

(2)The serviceman with injuries on the hand is not allowed to take this task.

Check the running status before and after cleaning, summarize the cleaning effect and

record the running data before and after cleaning.
8.3 Trial Run

(1)When the unit has not been used for a long period or the ambient temperature is below

5℃, keep the unit energized at least 8 hours before startup to preheat the crankcase
of the compressor so as to evaporate the liquid refrigerant inside the compressor

which otherwise would cause adverse effect on the compressor.

(2)Be sure valves are opened properly to prevent the compressor from being damaged by

the abnormal high pressure.

(3)Check the power supply and insulation conditions, and see initial settings of each

control and protection element are satisfactory, and then record relative records.

(4)Turn on the wired controller to check the error record. If any error exists, eliminated it

before restarting the unit.

(5)When a single unit has run stably, check the entering and leaving water temperature

difference, and adjust the water damper to make the temperature difference reach
2.5~6℃and then record related data.

(6)When all units have run stably, check the entering and leaving water temperature

difference of each on, and adjust the water damper to make the temperature

difference reach 2.5~6℃and then record related data.

(7)When all loads have been started and all units have run stably for one hour, check the

air conditioning and water temperature and see if they can meet the client’s
requirement and then record related data.
8.4 Routine Startup/Shutdown

It is recommended to start the system through the wired controller in the sequence of the

water pump first and then the main unit, and stop the system in a reverse sequence.

When the unit is not used for a long term or temperature is below 5℃, remember to keep the

unit energized at least 8 hours before startup to preheat the crankcase of the compressor so
as to evaporate the liquid refrigerant inside the compressor which otherwise would cause

adverse effect on the compressor.

When the function of the auxiliary electric heater is activated through the control panel, if the

ambient temperature is quite low and out of the nominal heating range, the control panel will
tell “As ambient temperature is low, startup is not allowed”. At this point, the auxiliary electric

heater will work, with the running indicator lighting on, the water pump running but the

compressor stopped.

When the function of the auxiliary electric heater is deactivated through the control panel, if
the ambient temperature is quite low and out of the nominal heating range, the control panel

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

25

Sayfa 30

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

will tell “As ambient temperature is low, startup is not allowed”. At this point, the auxiliary
electric heater will not work, with the running indicator lighting off and both the water pump and

compressor stopped.

When the unit is ready to perform heating but water temperature is below 20℃, in order to

keep stable and reliable operation, please do not start the terminal units until water
temperature goes up to 35℃.

8.5 Maintenance to the Main Parts

(1)During normal operation, the water pump is under the control of the main unit.

However, when flushing the water system, do not let the main unit control the water
pump.

(2)Do not start the unit until the water system has drained completely.

(3)Do not manually restart the unit until the stop interval exceeds 6 minutes.
8.6 Maintenance during Long-term Downtime

When the chiller is going to be stopped for a long period, maintenance listed below shall be

performed:

(1)Take the leakage test for the refrigerant tube. If leakage occurs, eliminate it.

(2)Maintain the water pump and air conditioning divides in accordance with the

suggestions provided by the manufacturer.

(3)Drain the water system by opening the discharge valve (especially in winter) to avoid

frostbite on the shell and tube.

(4)Switch off the power supply of the chiller and the water pump.

(5)Clean and dry the inside and outside surface of the chiller. Then, cover it against dust.
8.7 Startup after Long-term Shutdown

Preparations shall be taken when starting up the chiller which has not been used for a long
period.

(1)Completely check and clean up the chiller.

(2)Clean the water piping system.

(3)Check the water pump.

(4)Tighten all connectors.

(5)Take the leakage test for all piping. If leakage occurs, eliminate it.

(6)Regulate the water flow through the balance valve and check the water pressure.

(7)Check if the fan rotates properly.

(8)Check if the system vibration and noise are acceptable.
8.8 Parts Replacement

Only parts supplied by Gree can be replaced instead of similar parts supplied by others.

NOTE

26

Sayfa 31

8.9 Refrigerant Charging

Refrigerant charging should be done based on the discharge and suction pressure. An air

tight test must be taken on the condition refrigerant leaks or some part is required to be
replaced. Refrigerant charging comes into two cases stated below.

◆Complete charging

In this case, take a leakage test by charging hi-pressure nitrogen (15~20kg) or refrigerant
into the system. If soldering is required, note that gas inside the system must be expelled

firstly. The whole system must be dried and vacuumed prior to charging.

(1)Connect the manifold gauge.

(2)Vacuum the system with the vacuum pump.

(3)After the system pressure reaches the required value (<80Pa) for more than 30

minutes and keeps below 100Pa, charge refrigerant at the low pressure side as per
the rated specification on the nameplate.

(4)Refrigerant charge will be affected by the ambient temperature. When charged

refrigerant is under the required amount, add in accordance with the other charging

case stated below.

◆Adding

Connect the refrigerant charging port at the lower pressure side to the refrigerant tank and

install a manifold gage.

(1)Circuit the chilled water and start up the unit.

(2)Charge refrigerant vapor into the system slowly and check the suction and discharge

pressure.

(1)When performing the leakage and air tight test, never charge oxygen, acetylene and

other flammable and toxic gases but only hi-pressure air, nitrogen or refrigerant.

(2)Mineral scale on the surface of the heat exchanger will affect the heat exchanging

efficiency and increase the water resistance and lower the refrigeration capacity.

Therefore, it should be cleared away through dilute acid. Note that contents of
different water quality vary and should be treated with different type of acid by the

qualified chemical company.

8.10 Removal of the Compressor

Please take the steps below when the compressor is required to be removed.

(1)Cut off the power supply.

(2)Recover the refrigerant in a reasonable speed to prevent oil from being drawn out.

(3)Remove the power cord and the temperature sensor.

(4)Unsolder the soldering spots of the suction and discharge lines.

(5)Remove the screw bolts of the compressor and check the oil quality and accumulator.

(6)Remove the compressor.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

WARNING

27

Sayfa 32

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

(7)Clean up the pipeline.
8.11 Freeze Protection

When the flow passage of the shell-and-tube heat exchanger is frozen up, it would cause
serious damage to the heat exchanger, such as cracking and leakage which are out of

warranty, therefore, the user should take measures stated below for freeze protection:

(1)In order to make sure the unit can automatically perform defrosting under low

temperature, the water pump must be interlocked with the unit.

(2)(1) Under subzero condition, when the unit is required to perform cooling, anti-freeze

liquid should be added into the water system based on the table below.

(3)Under subzero condition, when the unit is not required to perform cooling for a short

term, the unit should be powered on; when the unit is not required to perform cooling
for quite a long term, disconnect the power supply and then drain the shell and tube

completely.

Table 8.11.1 Thermal and Physical Properties of the Glycol Solution

Quality Concentration
Initial Freezing Temperature
Density

16
-7
1020

19.8
-10
1025

23.6
-13
1030

27.4
-15
1035

31.2
-17
1040

35
-21
1045

38.8
-26
1050

42.6
-29
1055

46.4
-33
1060

Notes:

(1)This table is cited from Design Manual for Practical Refrigeration Engineering

published by China Architecture Industry Press. If physical data of the glycol has been
provided by the manufacturer, it always prevails.

(2)Once the glycol is taken as the second refrigerant, its initial freezing temperature of the

glycol solution should be 2~3℃lower than the lowest environment temperature.
8.12 Rountine Maintenance

Routine maintenance shall be performed periodically by the qualified technician so as to

extend the service life of the unit and lower the possibility of occurrence of faults.

Record weekly the running status of the unit to facilitate troubleshooting for the servicemen.

■
Daily Maintenance

(1)Check the circulating water pump and the flow rate.

(2)Check the voltage and power supply.

28

Sayfa 33

■
Weekly Maintenance

(1)Check the main unit, like if the compressor runs with abnormal noise, if the distribution

box is attached securely and if the pipeline generates abnormal vibration or leakage.

(2)Record key parameters, like pressure, pressure etc.

■
Quarterly Maintenance

(1)Check the electric wiring and electric insulation.

(2)Check and adjust the set point of the temperature.

■
Yearly Maintenance

(1)Check valves and pipeline of the water system. If necessary, clean the filter and

analyze the water quality. If the water circuit needs to be cleaned, please consult the
assistance of the qualified personnel.

(2)Clean the corrosive surface and paint it again, and check if the door of the electric

control cabinet is tightly closed.

(3)Check if the pipeline is secured and so the water pump and fittings. Additionally, check

if the refrigerant charge is sufficient, if not, add some.

(4)Perform the items for weekly maintenance.

(5)Check if the control device is set and acts properly.

(6)Check if the refrigerant pipe is attached securely.

(7)Check if the refrigerant pipe is attached securely.
8.13 Precautions

(1)Take periodic maintenance to the unit to guarantee normal operation.

(2)Once refrigerant leaks, shut down the unit immediately and contact the serviceman. No

open fire is allowed in that refrigerant will decompose into toxic gas.

(3)Switch off the main power supply in case of a fire hazard and extinguish it with effective

measures.

(4)The working environment shall be far away from the inflammable substance, such as

petroleum and alcoholic etc. to avoid explosion.

(5)The unit is allowed restarted only after any malfunction is eliminated, otherwise

refrigerant or chilled water would leak, in which case, it is imperative to turn off all
switches or the main power supply.

(6)Do not short-circuit the protection device, otherwise it would cause some malfunction.

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

29

Sayfa 34

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

9 Troubleshooting and After-sales Service
9.1 Troubleshooting Measures

Error
Possible Causes
Troubleshooting Measures

Shutdown against high
pressure protection of the

compressor

Shutdown against

overloading of the
compressor motor

Shutdown against low

pressure protection of the

compressor

1.Uncomplete vacuuming.
2.Too high envivornment

1.Revacuum the system and

recharge refrigerant.
2.Improve ventilation.

temperature.
3.Condenser fins are dirty

3.Clean condenser fins.

and there are blockages.
4.Inadequate condensing air

4.Repair the condenser fan.
5.Check the high pressure

flow and the condenser fan

switch.
6.Check the refrigerant

failed.
5.Failed high pressrue

charge and discharge some

cutoff.
6.Overcharged refrigerant.

refrigerant.

1.The voltage is too high or

1.Check if the voltage is or
no less than 80% and the

too low.
2.The discharge pressure is

phase difference does not

too high or too low.
3.The return water

exceed ±30%.
2.Check discharge pressure

temperature is too high.

and find out causes.
3.Check return water

4.The overloaded element is
faulty.

temperature and find out

5.The enviornment
temperature is too high.

causes.
4.Check the compressor

6.There is phase loss for the

current.
5.Improve ventilaiton.

compressor.
7.The compressor motor is

6.Check the three phase

short-circuited.

resistances.

1.The electrostatic

1.Replace the coils or even

expansion valve is faulty.

the valve body.

2.Check the low pressrue
cutoff.

5.The low pressure cutoff is
faulty.

3.Refrigerant is insufficient.
4.The entering chilled water

3.Check and charge
refrigerant.

temperature is 5.lower than

4.Check if the chilled water is

the rated.
6.The chilled water flow is

down-temperature.
5.Adjust the chilled water

too low.

flow.

30

Sayfa 35

Failed startup of the

compressor

Temperature sensor
protection

Pressure transducer error

Flow switch protection

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

1.The overcurrent relay

tripped off and the fuse was
burnt out.

2.The control circuit was
open.

1.Replace it.
2.Check wiring of the control

3.There is no current.

system.
3.Check the power supply.

4.Low/high pressure
protection.

4.See corresponding

5.The contact coils is burnt
out.

statement above.
5.Replace it.

6.The water flow is open-
circuited.

6.Check the water system.
7.Check the alarm type and

7.The wireless controller

take corresponding

raised the alarm signal.ON/
OFF time setting by the

corrective measure.
8.Check and reset it.

wireless controll is incorrect.
8.The sensed temperature

exceeded the rated.

1.The buld plug and the

main board plug were
connected incorrectly.

1.Check if the bulb plug was

connected to the correct

2.The temperature bulb was
damaged.

main board plug.
2.Replae it.

3.The main board was

3.Replace it.

damaged.

1.The pressure sensor is

open-circuited.
2.The pressure sensor is

1.Check the circuit of the
pressrue sensor.

short-circuited.

2.Replace it.

3.The pressure sensor is
damaged.

1.The water pump has not

started.
2.The water flow is too low.

1.Start the water pump.

2.Adjust the water flow.

3.The water flow switch was
damaged.

3.Adjust the water flow.
4.Dispel air inside the water

4.There was air inside the

system.

waer system.

31

Sayfa 36

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

Protection against the failed
4–way valve

Protection against the failed

compressor IPM module

Failed diischarge

temperature sensor

9.2 After-sales Service

When the unit in warranty has a quality issue or fails to operate properly under the allowable

operation condition, please contact the local sales representative for free service.

The user is required to designate personnel to take charge of the unit following the

instructions covered in this manual, otherwise any maintenance cost caused by the improper
operation will be at the user’s expense.

1.Check if the entering and
leaving water temperature

1.The entering and leaving

water temperature sensor

sensors were installed
correctly and if silica gel at

fell off or installed incorreclty.
2.The 4–way valve was

the probe for heat conduction

damaged.

was applied properly.
2.Replace it.

1.The voltage suddenly
dropped.

1.Check if it occured before
protection.

2.The compressor drive

2.Replace it.

board was damaged.

1.Decrease the load to

improve the water

1.Tow low water tempeature.
2.The discharge

temperature.
2.Check if the discharge

temperature sensor fell off.

temperature sensor installed
correctly.

32

Sayfa 37

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

Appendix A: Inspection Records Prior to Commissioning

33

Sayfa 38

A Series Inverter Modular Air-cooled Chiller (Heat Pump)

Appendix B: Trial Run and Commissioning Records

34

Sayfa 39

GREE ELECTRIC APPLIANCES, INC. OF ZHUHAI

Add: West Jinji Rd, Qianshan, Zhuhai, Guangdong, China, 519070
Tel: (+86-756) 8522218
Fax: (+86-756) 8669426
E-mail: gree@gree.com.cn  www.gree.com