1. GS1850 Unit: Ensure that there is sufficient clearance above and to the right of the unit for servicing purposes (5.9"/150mm minimum).
2. Inlet Pipe – 1½"/40mm: To be piped with a sufficient fall of no less than 1 in 40.
3. Outlet Pipe – 2"/54mm: To be piped with a sufficient fall of no less than 1 in 40.
4. Invert Inlet – 1¼"/32mm: Must be kept capped off with the 1¼"/32mm FlexiPlumb Endcap provided (for servicing use only).
5. Decant Outlet Hose – ¾"/18mm: To be piped directly into the main drainage pipe via a vented drainage stack as shown. The Hose must be fixed in place using the drainage hose support provided.
6. Pre-Filter: Ensure sufficient height above the Pre-Filter to allow for removal and daily maintenance of Pre-Filter basket.
7. Pre-Filter Basket: A Pre-Filter basket must be installed into the pre-filter at all times.
8. Pre-Filter Support Bar: The support bar must be installed when attaching the Pre-Filter.
9. Vortex Flow Controller: Must be fitted to the Pre-Filter inlet connection.
10. Sampling Point: Connected to the outlet of the unit: it is essential in the analysis of effluent leaving the unit.
11. Running Trap: The outlet of unit must be fitted with a running trap to reduce foul smells.
12. FOG Container: Ensure that the container is not restricted or blocked for daily maintenance.
13. Hot Water Solenoid Valve: Hot water must be connected to the unit using the ¾” BSP (F/F) Red PVC Hose provided, water supply must not exceed 3 bar pressure and 60°C/140°F. In the case of high pressure a pressure reducing valve must be used. Mains water connections must be made via a WRAS approved isolation valve which follows a WRAS approved double check valve.
14. Power Lead: The unit must be plugged into a 13 amp rated IP56 socket located below counter level.
15. Interconnecting Pipework: All pipework must be clipped and properly supported.
16. Stainless Steel Hygiene Stand (Optional Extra): GS1850 unit should be installed on a Stainless Steel Hygiene stand. It can be adjusted up to 2"/50mm in height to allow the unit to be levelled on uneven surfaces and provide access for cleaning.

Sayfa 2

● Make sure the unit is installed on level ground or adjust the stand feet to ensure the unit is level.
● Have a hot water connection available to connect to the unit, if one is not available the unit must be equipped with a Genie H2O to give hot water on demand. Water connection must be made via a WRAS approved isolation valve A and double check valve B.
● Have an IP56 rated socket C below counter level available to the unit to plug into. If a genie H2O is required ensure an additional power supply (preferably a fuse spur) is available.
● Ensure all pipe work into and out of the unit has at least a 1 in 40 fall (downwards angle of 1.5°).
● Clean the Pre-Filter basket and FOG container daily.
● An Air Admittance Valve D must be installed after the running trap so a siphon doesn't occur.
● The Decant Outlet Hose E needs to be plumbed into a vented drainage stack, using the drain hose support provided.
● Place the unit in passageways where it can be a hazard or be damaged.
● Open the unit or insert hands into any part of the unit; moving parts can cause injury.
● Stand or place heavy objects on top of the unit.
● Dismantle the unit in any way, only qualified service staff are to access the inside of the unit.